Construction scheduling / Bert Bielefeld.

By: Bielefeld, Bert
Material type: TextTextSeries: Basics (Basel, Switzerland): Publisher: Basel ; Boston : Birkhäuser, c2009Description: 83 p. : ill. (some col.) ; 23 cmISBN: 9783764388737 (pbk.)Uniform titles: Terminplanung. English Subject(s): Construction projects -- Management | Building -- Superintendence | Production scheduling | Bauablauf -- Terminplanung | Terminplanung -- BauablaufDDC classification: 690.0684
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode
UG Books from CL UG Books from CL BMS College of Architecture, Design and Planning
690.0684 (Browse shelf) Available CL-UG69236

Includes bibliographical references.

There are no comments for this item.

to post a comment.
Copyright © 2025, The Librarian, Library and Information Centre, BMSCA D&P, Bengaluru. All Rights Reserved
web counter

Powered by Koha